Introduction………………..03
Company Overview on international level………………...03
Vision…………………………………………...04
Mission statement…………….....04
Motto………………………………..…..04
Suppliers…………………...04
Employees…………………………….04
Customers……………………..05
Retailers……………………………....05
Consumers………………………………….05
Society……………………05
Products……………………….…..05
Organization……………………......07
Strengths………………………….…..07
Weaknesses ………………..... ..08
Why Tetra Pak as a job…………………….... ..08
A demanding and rewarding company……………………….08
Growing with the company……………………………………......08
Managing your own development…………….……09
Life balance………………..………09
Our internship in Tetra Pak……………………….……….10
Printing Section………………………………10
Flexo-graphic printing……………………………….....10
Ink used for flexo-graphic printing…………..……11
Board use for flexo-graphic printing…………….....12
Differences between the new factory machine and old factory machine…………………….12
Printing Process………………………..….13
Pre-press Section…………………………….…....13
Exposing Unit……………………….….13
Processor……………………..…...14
Dryer………………………………....14
Finisher……………………....14
Printing Machine……………………….....16
Unwinding ……………………………..16
Printing Unit………………….......16
Creasing……………………………..16
Winding…………………......16
Different Parts of the printing Unit……………………………….....17
Aniloxs roller………………….…………..17
Ink Dispenser…………………….…..17
7.3Doctor Chamber…………………17
7.4 Pumps…………………………17
7.5Dryers…………………………………....18
7.6 Types of Job…………………...18
8Cleaning Section……………………18
8.1 Flexo-Wash………………………19
8.2 Alka-wash……………………..19
8.3Waste water control of printing press……………………....20
8.4Waste water control of cleaning machine………………..20
9Waste Water Quantity…………..…..21
9.1Methods of waste water treatment………………………….21
9.1.1 Microfiltration………………….…..21
9.1.1.1 Process operation…………………….…..22
9.1.1.2 Recommended operating conditions for membrane…………..…23
9.1.1.3 Estimation cost………………………….…..24
9.1.1.4 Requirement for installation of plant………...24
9.1.1.5 Total estimation cost……………………….….24
9.1.2Steam circulation method………..25
9.1.2.1 Procedure:………………………………..…....25
9.1.2.2 Dimensions for steam unit……………………….....25
9.1.2.3 Estimation cost…………………………...26
9.1.2.4 Requirement for installation of plant…….....26
9.1.2.5 Total estimation cost…………………..26
Company Overview on international level………………...03
Vision…………………………………………...04
Mission statement…………….....04
Motto………………………………..…..04
Suppliers…………………...04
Employees…………………………….04
Customers……………………..05
Retailers……………………………....05
Consumers………………………………….05
Society……………………05
Products……………………….…..05
Organization……………………......07
Strengths………………………….…..07
Weaknesses ………………..... ..08
Why Tetra Pak as a job…………………….... ..08
A demanding and rewarding company……………………….08
Growing with the company……………………………………......08
Managing your own development…………….……09
Life balance………………..………09
Our internship in Tetra Pak……………………….……….10
Printing Section………………………………10
Flexo-graphic printing……………………………….....10
Ink used for flexo-graphic printing…………..……11
Board use for flexo-graphic printing…………….....12
Differences between the new factory machine and old factory machine…………………….12
Printing Process………………………..….13
Pre-press Section…………………………….…....13
Exposing Unit……………………….….13
Processor……………………..…...14
Dryer………………………………....14
Finisher……………………....14
Printing Machine……………………….....16
Unwinding ……………………………..16
Printing Unit………………….......16
Creasing……………………………..16
Winding…………………......16
Different Parts of the printing Unit……………………………….....17
Aniloxs roller………………….…………..17
Ink Dispenser…………………….…..17
7.3Doctor Chamber…………………17
7.4 Pumps…………………………17
7.5Dryers…………………………………....18
7.6 Types of Job…………………...18
8Cleaning Section……………………18
8.1 Flexo-Wash………………………19
8.2 Alka-wash……………………..19
8.3Waste water control of printing press……………………....20
8.4Waste water control of cleaning machine………………..20
9Waste Water Quantity…………..…..21
9.1Methods of waste water treatment………………………….21
9.1.1 Microfiltration………………….…..21
9.1.1.1 Process operation…………………….…..22
9.1.1.2 Recommended operating conditions for membrane…………..…23
9.1.1.3 Estimation cost………………………….…..24
9.1.1.4 Requirement for installation of plant………...24
9.1.1.5 Total estimation cost……………………….….24
9.1.2Steam circulation method………..25
9.1.2.1 Procedure:………………………………..…....25
9.1.2.2 Dimensions for steam unit……………………….....25
9.1.2.3 Estimation cost…………………………...26
9.1.2.4 Requirement for installation of plant…….....26
9.1.2.5 Total estimation cost…………………..26
waqas- Monstars
-
Posts : 283
Join date : 2011-02-13
Age : 37
Re: Internship Reoprt / MBA Final Project of Tetra Pak Limited Lahore
Will be provided on Demand Kindly Send me Private message to get this report
waqas- Monstars
-
Posts : 283
Join date : 2011-02-13
Age : 37
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|
Sat May 04, 2024 11:49 am by ali001
» house disrepair claims
Thu May 02, 2024 4:29 pm by Ibad Khan Buledi
» Bounce n Bang: Physics puzzler
Thu May 02, 2024 11:39 am by ali001
» AIChatSY - AIChatbot Assistant
Wed May 01, 2024 10:48 am by ali001
» Storybook Magic App
Tue Apr 30, 2024 7:06 pm by ali001
» Flower Book Match3 Puzzle Game
Tue Apr 30, 2024 12:17 pm by ali001
» Avian Influenza Symptom in Chickens "Bird Flu H5N1 Virus" Vet learning materials, Poultry Farming
Sat Apr 27, 2024 9:57 am by Ibad Khan Buledi
» Aloha Planner - Note-Taker
Thu Apr 11, 2024 4:52 pm by ali001
» Streaming Guide Film TV Series
Tue Apr 09, 2024 9:39 pm by ali001