CS507 Information System Assignment # 3 Solution Spring 2013
Page 1 of 1 • Share
CS507 Information System Assignment # 3 Solution Spring 2013
Assignment No. 03
Semester Spring 2013
Information System CS507 - Total Marks: 20
Due Date: 19/06/2013Objective: Understanding the Flow Charts and its usage.
Lectures Covered: 15 - 24
Cognitive Level: Comprehensive
Instructions:
Please read the following instructions carefully before submitting assignment:
- You have to submit your assignment before or on due date on VU-LMS.
- Assignment should be completed by your own efforts; it should not be copied from internet, handouts or books.
- You should submit your solution in Word File only via assignment interface at VU-LMS.
- Assignment sent via Email will not be replied and accepted/graded in any case.
- If the submitted assignment does not open or file is corrupt, it will not be graded.
For any query about the assignment, contact at [You must be registered and logged in to see this link.]
Note: Your Flow Chart must fulfill all the given requirements and solution should be in .docx or .doc format, otherwise it will not be accepted in any way. Image format like .jpeg, .bmp etc and copy paste images of flow chart in MS word format will be awarded zero marks without checking thesolution
BEST OF LUCKPrepare a flow chart for a leather shoe manufacturing firm ABC, which follows the given procedure for making shoes:
The firm ABC starts the working of preparing leather shoes by purchasing raw material (leather) from different whole sellers. After this, the firm performs the necessary processing on the raw material (leather) to turn it into the form suitable for shoe making.
In next step the “Prepare Department” performs the necessary functions of preparing the shoes and handovers the shoes to the concerned department for Testing/QA.
Testing / QA department checks the shoes on the set criteria by the firm. In case of any defect in theshoe(s), the faulty shoe(s) is / are sent back to the “Prepare Department” for removing the defect which sends again for testing after amendments. After clearing testing/QA, the firm gets the final quality product.
Note: Your Flow Chart must fulfill all the given requirements and solution should be in .docx or .doc format, otherwise it will not be accepted in any way. Image format like .jpeg, .bmp etc and copy paste images of flow chart in MS word format will be awarded zero marks without checking thesolution
plhr60- Monstars
-
Posts : 536
Join date : 2011-10-20
Age : 34
Character sheet
Experience:
(33/500)
Re: CS507 Information System Assignment # 3 Solution Spring 2013
1st Question:
KSS / IS (Expert System). 4 components are :
1.User Interface,
2.Knowledge Base,
3.Inference Engine and
4.Development Engine.
KSS / IS (Expert System). 4 components are :
1.User Interface,
2.Knowledge Base,
3.Inference Engine and
4.Development Engine.
plhr60- Monstars
-
Posts : 536
Join date : 2011-10-20
Age : 34
Character sheet
Experience:
(33/500)
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|
Mon Apr 22, 2024 11:23 am by Joshuaadam
» Aloha Planner - Note-Taker
Thu Apr 11, 2024 4:52 pm by ali001
» Streaming Guide Film TV Series
Tue Apr 09, 2024 9:39 pm by ali001
» Apricot Tree Problems & Solutions ????|خوبانی کے پھل کو کیڑا لگنےسے بچانے کا طریقہ ????
Sun Apr 07, 2024 6:28 am by Zamaan Khan
» خوبانی کے پودے کی کاشت گرم علاقوں میں کرنی چاہیے یا نہی
Sun Apr 07, 2024 6:24 am by Zamaan Khan
» New Here
Sun Apr 07, 2024 6:15 am by Zamaan Khan
» Bajta Hua Sochoon Main Koi Saaz Na Aaye Naat
Sun Apr 07, 2024 6:14 am by Zamaan Khan
» Woh Pagal Si Episode 52 to 62 - Top Pakistani Drama
Sun Apr 07, 2024 6:06 am by Zamaan Khan
» Woh Pagal Si Episode 42 to 51 - Top Pakistani Drama
Sat Apr 06, 2024 4:50 pm by Ch. Ehtisham Gujjar