Karachi stays unplugged for 12 hours
Page 1 of 1 • Share
Karachi stays unplugged for 12 hours
[You must be registered and logged in to see this image.]
KARACHI: Most of the areas of the metropolis continue to face severe loadshedding, as the outages of up to 12 hours have made it impossible for the citizens to carry out routine activities, Geo News reported Sunday.
However, the spokesman of Karachi Electric Supply Company (KESC), has claimed that only 3 to 4-hour loadshedding was being undertaken.
The most affected of the city are North Karachi, Nazimabad, Gulshan-e-Iqbal, Federal B Area, Gulistan-e-Jauhar, Defence, Orangi, Jacob Line, Lyari and Kharadar are most affected which get plugged for one hour and unplugged for the next one to one-and-a-half-hour.
The spokesman of the utility said on the directive of Federal Minister for Petroleum Dr. Asim, only 190 MMF gas was being supplied by Sui Southern Gas Company (SSGC) to KESC.
The power supply from National Transmission Distribution Company has also declined to 300 MW against the normal supply of 650 MW.
The power prolonged loadshedding has also affected the water supply to the citizens, further adding to their hardship.
KARACHI: Most of the areas of the metropolis continue to face severe loadshedding, as the outages of up to 12 hours have made it impossible for the citizens to carry out routine activities, Geo News reported Sunday.
However, the spokesman of Karachi Electric Supply Company (KESC), has claimed that only 3 to 4-hour loadshedding was being undertaken.
The most affected of the city are North Karachi, Nazimabad, Gulshan-e-Iqbal, Federal B Area, Gulistan-e-Jauhar, Defence, Orangi, Jacob Line, Lyari and Kharadar are most affected which get plugged for one hour and unplugged for the next one to one-and-a-half-hour.
The spokesman of the utility said on the directive of Federal Minister for Petroleum Dr. Asim, only 190 MMF gas was being supplied by Sui Southern Gas Company (SSGC) to KESC.
The power supply from National Transmission Distribution Company has also declined to 300 MW against the normal supply of 650 MW.
The power prolonged loadshedding has also affected the water supply to the citizens, further adding to their hardship.
Zeba Khan Hoti- Monstars
- Posts : 773
Join date : 2011-02-24
Similar topics
» Karachi experiencing 10 hours of loadshedding
» How to get benefit from 24 hours
» What will be the charges in Evo Lite Package after the first 50 hours
» 1 killed in 2nd deadly air show crash in 24 hours
» One more shot dead in Karachi
» How to get benefit from 24 hours
» What will be the charges in Evo Lite Package after the first 50 hours
» 1 killed in 2nd deadly air show crash in 24 hours
» One more shot dead in Karachi
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|
Sat May 04, 2024 11:49 am by ali001
» house disrepair claims
Thu May 02, 2024 4:29 pm by Ibad Khan Buledi
» Bounce n Bang: Physics puzzler
Thu May 02, 2024 11:39 am by ali001
» AIChatSY - AIChatbot Assistant
Wed May 01, 2024 10:48 am by ali001
» Storybook Magic App
Tue Apr 30, 2024 7:06 pm by ali001
» Flower Book Match3 Puzzle Game
Tue Apr 30, 2024 12:17 pm by ali001
» Avian Influenza Symptom in Chickens "Bird Flu H5N1 Virus" Vet learning materials, Poultry Farming
Sat Apr 27, 2024 9:57 am by Ibad Khan Buledi
» Aloha Planner - Note-Taker
Thu Apr 11, 2024 4:52 pm by ali001
» Streaming Guide Film TV Series
Tue Apr 09, 2024 9:39 pm by ali001